Over the last week I have basically completed the EK tuck project and Got a ton done on the RHD Integra as well. All thats left to do on the EK is build the new intercooler piping, bleed the brake and clutch systems and a few interior pieces. Power has been connected and everything is working perfectly.
As far as the Integra, Everything is fit and pulled together and its about 30% welded.
As far as the Integra, Everything is fit and pulled together and its about 30% welded.
In these pics the valve cover is just stripped ready for paint. Put it on for pics.
As soon as the Rywire jumper arrives the rest of the interior will go back in.