Didnt have much time in the shop today but i still managed to get quite a bit done.  Fished welding Joey's downpipe, cut the dumptube, mounted the catchcan and welded up most of the intercooler piping.  Also got a good start on Ricco's intercooler piping.  Unfortunately I didnt take many pics.  Heres a few, more updates soon.
 
Its been a crazy week.  A lot of things going on.  Throughout the week we got Kennys AC tuck done, although as it turns out he needs a new evaporator to get it going,  Got the radiator support bar made for the 240 tube front project,  Got Joeys hood exit exhaust about wrapped up,  did a brake tuck on a DA for a friend on location, drove to Tampa and bought a new tig machine and Big John got Geralds 240 bay sprayed.  Heres a few pics, didnt take too many unfortunately.

Kennys EK
Gerald's 240
New Tig. Lincoln Square Wave 175 pro.
 
The past few days have been pretty busy.  The tube front 240 is cut apart and ready for frame work.  Templates are made as well.  Completed the wiring portion and interior portion on the EK tuck project.  Also got the ac lines made for Kenny's AC tuck.  All but 1 line anyways.  It will be complete by tues morning.Big ups to Adam @Cool Cars in Jax Beach for helping me with the lines. 

240 Tube Front
EK Tuck Project
Kenny's AC Tuck.  1 more line to go.
 
Had a short day yesterday but got quite a bit done.  Got the intercooler brackets done and mounted on the EK and got a good start on piping mock up.  Also got the front end of Jeremys 240 completely tore down and ready to cut apart for the tube front end.

Also John was having a few issues with the exhaust on the Ruckus so we decided to shorten it by about 6" and fix the bracket that was holding it on.  More to come later in the week.


 
Shes close now.  Almost time for sealing.
 
Over the last week I have basically completed the EK tuck project and Got a ton done on the RHD Integra as well.  All thats left to do on the EK is build the new intercooler piping, bleed the brake and clutch systems and a few interior pieces.  Power has been connected and everything is working perfectly.

As far as the Integra,  Everything is fit and pulled together and its about 30% welded.
In these pics the valve cover is just stripped ready for paint.  Put it on for pics.
As soon as the Rywire jumper arrives the rest of the interior will go back in.
 
Today is short and sweet.  Got the engine installed and its mostly done at this point.   Just need to reinstall the rest of the turbo stuff and finish the wiring inside and its a wrap.  Should be finished by fri evening.

    Archives

    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012

    T-SHIRTs 15$

    Picture




    We sell and install Speedfactory tucked radiators. Click for more details.